Sewer Mains Maintenance - River Road - 6-7 May 2026
IMPORTANT MAINTENANCE NOTICE - SEWER MAINS REHABILITAION
Masterton District Council has contracted our company to carry out relining of the public sewer network in your area. We intend to line the public sewer along River Road during the period starting from May 6 - 7, 2026.
Work will be undertaken: (Weather permitting) between the hours of 7.00am and 6.00pm and will take 1-2 days per liner installed. Main addresses that will be affected by these works are as follows:
From 1 River Road to 11 River Road and 2 River Road to 10 River Road.
We will require the properties affected by this work NOT to use their Toilet, Bath, Laundry, Kitchen sink, Dish Washer or any other means that discharges waste water into the sewer pipes for a short period of time (approximately 2-3 hours) only on the day of lining.
Pipe Technologies staff will inform (door knock) the properties affected on the day of lining when we require you not to use any of the services listed below. This is expected to be a 2-3 hour period during which time we ask that:
Toilets flushing is restricted where possible
Dishwashers are not used
Washing machines are not used.
Tub, basin, bath or sink water is not disposed of
Automatic wastewater discharge pumps are switched off.
If we encounter any problems and there are delays in returning the sewer back to normal operation, then you will be advised of the delay.
Pipe Technologies strive to minimize interruption to properties and apologize in advance for any noise nuisance caused by these operations, and assure you that we will aim to minimize the length of time any such plant is operating.
Please call the Council with any queries or to report issues - 06 370 6300
Thank you for your assistance in helping us undertake this essential work.
Yours faithfully
PIPE TECHNOLOGIES LTD